See Similar Listings
Merchandise   USA   VA   Woodbridge Area   Musical Instruments -

Vintage 80's Schecter Monstertone Pickup Set - Splittable Coils- Nice Long Leads | Musical Instrum1

This listing was posted on Americanlisted.

Vintage 80's Schecter Monstertone Pickup Set - Splittable Coils- Nice Long Leads

Location:
Woodbridge, VA
Description:

This is a used set of Schecter Monstertones from the 80's (with plenty of 3 wire lead). Using my multi-tester I measured:Pickup #1: 6.28 ohms of resistance full power and 3.82 ohms split Pickup #2: 5.05 ohms of resistence full power and 3.06 ohms splitPickup #3: 4.98 ohms of resistance full power and 3.02 ohms split Nice pieces for replacement or project. These are used and not new item, so please look at the pictures and read the description as this item is sold as-is with no returns. Three functional pickups are included in this auction. There are no additional items.Shipping is available to locations within the lower 48 states contiguous states within the USA only for a charge of $22.00. Shipping to Alaska or Hawaii will require an additional $8.00 upcharge to cover the additional cost w/ results in a total shipping charge of $30.00
Category:
Musical Instruments
Posted:
December 19 2023 on Americanlisted
Visit Our Partner Website
This listing was posted on another website. Click here to open: Go to Americanlisted
Important Safety Tips
  • Meet the seller in person and inspect items before paying.
  • Be cautious of underpriced offers.
  • Don’t wire money or take advance payments.
  • Only pay for shipping if you know the seller.

To learn more, visit the Safety Center or click here to report this listing.

More About this Listing: Vintage 80's Schecter Monstertone Pickup Set - Splittable Coils- Nice Long Leads
Vintage 80's Schecter Monstertone Pickup Set - Splittable Coils- Nice Long Leads is a Musical Instruments for Sale located in Woodbridge VA. Find other listings like Vintage 80's Schecter Monstertone Pickup Set - Splittable Coils- Nice Long Leads by searching Oodle for Musical Instruments for Sale in Woodbridge.